Celina High School Renovations & Additions
Celina ISD is proud to expand and enhance Celina High School, a 232,109-square-foot campus located at 3455 N. Preston Road on the north end of town. This project includes both a major three-story addition and renovations to the existing two-story high school, creating new opportunities for Bobcat students to learn, create, and thrive.
Renovations bring updated spaces such as counseling and administrative suites, theater technology areas, costume and makeup rooms, life skills classrooms, and modernized locker rooms.
The new three-story addition adds dynamic facilities, including:
-
A gymnasium and weight room
-
Career & Technical Education (CTE) shops and an agricultural barn
-
Band and orchestra halls
-
A black box theater
-
Specialized labs and studios for animal science, floral design, culinary arts, fashion design, AV broadcast, esports, and forensics
-
A student café
-
Multiple new science labs and classrooms
The updated design features a masonry and stone exterior with a durable PVC roofing system, while safety remains a top priority with secured entry vestibules, card access control, and internal/external security cameras.
Opening Timeline:
-
Fall 2025 – Ag barn, CTE shops, black box theater, orchestra hall, gym, weight room, locker rooms, administrative and counseling suites, and theater costume/makeup areas
-
Fall 2026 – Band hall, animal science, floral lab, culinary arts, esports, fashion design studio, café, AV broadcast studio, forensics lab, and additional science labs/classrooms
Celina High School’s renovations and additions ensure students have access to state-of-the-art facilities that support academics, fine arts, athletics, and career pathways—continuing our commitment to Bobcat Excellence.